Installation of 4 production lines and power supply for Zeppelin France Automation. Planning, installation of trays, cables, and supporting the I/O test.
Installation of 4 production lines and power supply, including planning and deployment of trays, cables, and supporting the I/O test.
Technological cabling for fattening automation, encompassing sensor connection and integration with other automation controls.
Implementation of a complete production line, involving Inox cable tray planning, installation, cable laying, and power panel wiring.
Installing 4 production lines and power for Zeppelin France Automation. Planning, tray and cable installation, plus I/O test support.
Construction of a 1000 m2 brick building and 2 studios (1460 m2 and 1300 m2), ensuring high-current, low-current, and lightning protection for Kraft Rental Kft.
2724 Újlengyel, Nyári Pál utca 15. - Hungary
+36 30 146 5091